A. method of perpendicular offsets
B. method of oblique offsets
C. method of ties
D. all involve equal measurement on the ground
Civil Engineering Mcqs
Civil Engineering Mcqs for Preparation of Job Test and interview, freshers, Students, competitive exams etc. Multiple choice questions here are on topics such as Building Construction, Materials for Construction, Basic Surveying, Highway Engineering, Dams, Airport Engineering, Structural Analysis etc.
A. always additive
B. always subtractive
C. always zero
D. sometimes additive and sometimes subtractive
A. 2%
B. 2.5%
C. 3%
D. 4%
A. sides towards the centre
B. centre towards the sides
C. lower edge towards the upper edge
D. upper edge towards the lower edge
A. 20 kmph
B. 30 kmph
C. 40 kmph
D. 50 kmph
A. only on the hill side of road
B. only on the opposite side of hill
C. on both sides of road
D. none of the above
A. sloping drain
B. catchwater drain
C. side drain
D. cross drain
A. mastic asphalt
B. sheet asphalt
C. bituminous carpet
D. bituminous concrete
A. mastic asphalt
B. sheet asphalt
C. bituminous carpet
D. bituminous concrete
A. Quantity of binder required for tack coat is less than that required for prime coat
B. Prime coat treatment is given for plugging the voids in water bound macadam during bituminous road construction
C. Seal coat is the final coat over certain previous bituminous pavements
D. A bitumen primer is a high viscosity cutback