A. line ranger
B. steel tape
C. optical square
D. cross staff
Civil Engineering Mcqs
Civil Engineering Mcqs for Preparation of Job Test and interview, freshers, Students, competitive exams etc. Multiple choice questions here are on topics such as Building Construction, Materials for Construction, Basic Surveying, Highway Engineering, Dams, Airport Engineering, Structural Analysis etc.
A. measuring approximate horizontal angles
B. setting out right angles
C. measuring bearings of the lines
D. none of the above
A. straightening the links
B. removing one or more small circular rings
C. closing the joints of the rings if opened out
D. all of the above
A. is used at the time of standardising the tape
B. neutralizes the effect due to pull and sag
C. makes the correction due to sag equal to zero
D. makes the correction due to pull equal to zero
A. 1 in 100
B. 1 in 250
C. 1 in 500
D. 1 in 1000
A. 45° only
B. 90° only
C. either 45° or 90°
D. any angle
A. 30°
B. 45°
C. 60°
D. 90°
A. 4 chains
B. 6 chains
C. 120 m
D. 180m
A. 20°
B. 30°
C. 45°
D. 60°
A. degree of accuracy required
B. method of setting out the perpendiculars and nature of ground
C. scale of plotting
D. all of the above
