A. normal to face
B. inclined at 45° to the face
C. inclined at 15° to the face
D. inclined at 30° to the face
A. only up holes
B. only down holes
C. horizontal or up holes
D. horizor„al, down or up holes
A. wagon drill, churn drill, shot drill
B. wagon drill, shot drill, churn drill
C. shot drill, churn drill, wagon drill
D. churn drill, wagon drill, shot drill
A. 6 mJ per second per m2 of face area
B. 6 m3 per minute per m2 of face area
C. 20 m3 per minute per m2 of face area
D. 6 m3 per hour per m2 of face area
A. stone masonry
B. timber
C. cast iron
D. cement concrete
A. Needle beam method
B. Army method
C. German method
D. Italian method
A. silt
B. sand
C. clay
D. gravel
A. Army method
B. Needle beam method
C. Austrian method
D. English method
1. marking tunnel profile
2. loading explosives and blasting
3. checking misfire
4. mucking
5. removing foul gas
6. setting up and drilling
7. guniting
Select the correct answer using the codes given below
Codes ?
A. 1,6,5,3,4,2,7
B. 1,2,6,3,5,4,7
C. 1, 6,2, 5,4, 3, 7
D. 1,6,2,5,3,4,7
