A. Predicting staffing levels
B. Predicting software cost
C. Predicting software schedules
D. Predicting clients demands
Explanation: Demands can vary from client to client
Advertisement
Related Mcqs:
- Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems ?
- A. Agile method B. Parallel compilation method C. Large systems method D. All of the mentioned...
- Which of the following option is not tracked by configuration management tools ?
- A. Tracking of change proposals B. Storing versions of system components C. Tracking the releases of system versions to customers D. None of the mentioned...
- Which of the following is not an approach to software cost estimation ?
- A. Empirical B. Heuristic C. Analytical D. Critical...
- Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
- A. An application-composition model B. A post-architecture model C. A reuse model D. An early design model...
- What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?
- A. Change control B. Version control C. SCIs D. None of the mentioned...
- What can be used to complement decomposition techniques and offer a potentially valuable estimation approach in their own right ?
- A. Automated estimation tools B. Empirical estimation models C. Decomposition techniques D. Both Automated estimation tools and Empirical estimation models...
- Estimation of size for a project is dependent on___________________?
- A. Cost B. Time C. Schedule D. None of the mentioned...
- The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
- A. EV = (Sopt + 4Sm + Spess)/4 B. EV = (Sopt + 4Sm + Spess)/6 C. EV = (Sopt + 2Sm + Spess)/6 D. EV = (Sopt + 2Sm + Spess)/4...
- Which of the following are parameters involved in computing the total cost of a software development project ?
- A. Hardware and software costs B. Effort costs C. Travel and training costs D. All of the mentioned...
- Which of the following is a systematic attempt to specify threats to the project plan ?
- A. Risk identification B. Performance risk C. Support risk D. Risk projection...
Advertisement