A. Predicting staffing levels
B. Predicting software cost
C. Predicting software schedules
D. Predicting clients demands
Explanation: Demands can vary from client to client
Related Mcqs:
- Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems ?
A. Agile method
B. Parallel compilation method
C. Large systems method
D. All of the mentioned - Which of the following option is not tracked by configuration management tools ?
A. Tracking of change proposals
B. Storing versions of system components
C. Tracking the releases of system versions to customers
D. None of the mentioned - Which of the following is not an approach to software cost estimation ?
A. Empirical
B. Heuristic
C. Analytical
D. Critical - Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?
A. Change control
B. Version control
C. SCIs
D. None of the mentioned - What can be used to complement decomposition techniques and offer a potentially valuable estimation approach in their own right ?
A. Automated estimation tools
B. Empirical estimation models
C. Decomposition techniques
D. Both Automated estimation tools and Empirical estimation models - Estimation of size for a project is dependent on___________________?
A. Cost
B. Time
C. Schedule
D. None of the mentioned - The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
A. EV = (Sopt + 4Sm + Spess)/4
B. EV = (Sopt + 4Sm + Spess)/6
C. EV = (Sopt + 2Sm + Spess)/6
D. EV = (Sopt + 2Sm + Spess)/4 - Which of the following are parameters involved in computing the total cost of a software development project ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned - Which of the following is a systematic attempt to specify threats to the project plan ?
A. Risk identification
B. Performance risk
C. Support risk
D. Risk projection