A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model
Related Mcqs:
- Which model assumes that systems are created from reusable components, scripting or database programming ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - Which of the following is the process of assembling program components, data, and libraries, and then compiling and linking these to create an executable system ?
A. System building
B. Release management
C. Change management
D. Version management - Which model is used during early stages of the system design after the requirements have been established ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - Which of the following is not achieved by an automated estimation tools ?
A. Predicting staffing levels
B. Predicting software cost
C. Predicting software schedules
D. Predicting clients demands - Which of the following option is not tracked by configuration management tools ?
A. Tracking of change proposals
B. Storing versions of system components
C. Tracking the releases of system versions to customers
D. None of the mentioned - What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?
A. Change control
B. Version control
C. SCIs
D. None of the mentioned - Which of the following is not an option to achieve reliable cost and effort estimate ?
A. Base estimates on similar projects that have already been completed
B. Use one or more empirical models for software cost and effort estimation
C. Use relatively simple decomposition techniques to generate project cost and effort estimates
D. The ability to translate the size estimate into human effort, calendar time, and dollars - Which of the following costs is not part of the total effort cost ?
A. Costs of networking and communications
B. Costs of providing heating and lighting office space
C. Costs of lunch time food
D. Costs of support staff - Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
A. FP-Based Estimation
B. Process-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO