A. synthesising in concepts
B. is built of activities oriented program-mes
C. is, based on one time eytimate
D. is used for repetitive works
E. all of the above
Related Mcqs:
- Motion study is used for________________?
Choose the wrong statement?
A. improving a work method
B. improvising a work method
C. designing a work method
D. providing a schematic framework
E. reducing inventory costs - Which of the following is independent of sales forecast______________?
A. productivity
B. inventory control
C. production planning
D. production control
E. capital budgeting - Which one of the following represents a group incentive plan ?
A. Scanlon Plan
B. Rowan Plan
C. Bedaux Plan
D. Taylor Differential Piece Rate System
E. Halsey Premium Plan - The objective of time study is to determine the time required to complete a job by_______________?
A. fast worker
B. average worker
C. slow worker
D. new entrant
E. any one of the above - Father of industrial engineering is_________________?
A. Jeck Gilberth
B. Gnatt
C. Taylor
D. Newton
E. none of the above - Micro motion study is__________________?
A. analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. motion study* observed on enhanced time intervals
C. motion study of a sequence of operations conducted systematically
D. study of man and machine conducted simultaneously
E. scientific, analytically procedure for determining optimum work method - Which one of the following represents a group incentive plan ?
A. Halsey Premium Plan
B. Bedaux Plan
C. Lincoln Plan
D. Rowan Plan
E. Taylor Plan - The artificial activity; which indicates that an activity following it cannot be started unless, the preceding activity is complete, is known as_________________?
A. event
B. free float
C. artificial
D. constraint
E. dummy - The important file in making a PERT is__________________?
A. an event can’t be accomplished until activities leading to it are completed
B. no activity from any event can be started from preceding event till it is completed
C. length of arrow has nothing to do with time
D. every activity must be completed before end point is reached
E. all of the above - The two-bin system is concerned with_________________?
A. ordering procedure
B. forecasting sales
C. production planning
D. despatching and expediting
E. none of the above