A. 20 to 40 tonnes/hr
B. 50 to 100 tonnes/hr
C. 100 to 150 tonnes/hr
D. 150 to 200 tonnes/hr
Related Mcqs:
- The maximum length of a screw conveyer is about___________?
A. 30 metres
B. 40 metres
C. 60 metres
D. 100 metres - Belt conveyer can be used to transport coal at inclinations upto____________?
A. 30°
B. 60°
C. 80°
D. 90° - Pipes carrying steam are generally made up of_____________?
A. steel
B. cast iron
C. copper
D. aluminium - The capacity of large turbo-generators varies from___________?
A. 20 to 100 MW
B. 50 to 300 MW
C. 70 to 400 MW
D. 100 to 650 MW - Where unpulverised coal has to be used and boiler capacity is large, the stoker which is used is______________?
A. underfeed stoker
B. overfeed stoker
C. any - Which of the following load is responsible for lower power factor of supply system__________?
A. induction motors
B. resistive loads
C. synchronous Motors
D. all of the above - Load factor of a power station is defined as____________?
A. maximum demand/average load
B. average load x maximum demand
C. average load/maximum demand
D. none of the above - Load curve is useful in deciding the__________?
(a) A. operating schedule of generating units
B. sizes of generating units
C. total installed capacity of the plant
D. all of the above - If the load factor of a power station is high then its cost of generation will be_______?
A. High.
B. Low.
C. Remain same.
D. Depend upon plant type. - The ideal load factor should be_____________?
A. unity
B. zero
C. negative.
D. infinity.