A. reconnaissance, map study, preliminary survey and detailed survey
B. map study, preliminary survey, reconnaissance and detailed survey
C. map study, reconnaissance, preliminary survey and detailed survey
D. preliminary survey, map study, reconnaissance and detailed survey
Related Mcqs:
- Most suitable material for highway embankments is______________?
A. granular soil
B. organic soil
C. silts
D. clays - On a horizontal curve if the pavement is kept horizontal across the alignment, then the pressure on the outer wheels will be_________________?
A. more than the pressure on inner wheels
B. less than the pressure on inner wheels
C. equal to the pressure on inner wheels - The transition curve used in the horizontal alignment of highways as per IRC recommendations is_______________?
A. spiral
B. lemniscate
C. cubic parabola
D. any of the above - The ruling design speed on a National Highway in plain terrain as per IRC recommendations is_____________?
A. 60 kmph
B. 80 kmph
C. 100 kmph
D. 120 kmph - Highway facilities are designed for_________________?
A. annual average hourly volume
B. annual average daily traffic
C. thirtieth highest hourly volume
D. peak hourly volume of the year - For highway geometric design purposes the speed used is________________?
A. 15th percentile
B. 50 “”percentile
C. 85th percentile
D. 98 “”percentile - In highway construction, rolling starts from________________?
A. sides and proceed to centre
B. centre and proceed to sides
C. one side and proceed to other side
D. any of the above - In highway construction on super elevated curves, the rolling shall proceed from_________________?
A. sides towards the centre
B. centre towards the sides
C. lower edge towards the upper edge
D. upper edge towards the lower edge - For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?
A. dry rolling, wet rolling, application of screening and application of filler
B. dry rolling, application of filler, wet rolling and application of screening
C. dry rolling, application of screening, wet rolling and application of filler
D. dry rolling, application of screening, application of filler and wet rolling - The maximum design gradient for vertical profile of a road is______________?
A. ruling gradient
B. limiting gradient
C. exceptional gradient
D. minimum gradient