A. sides and proceed to centre
B. centre and proceed to sides
C. one side and proceed to other side
D. any of the above
Related Mcqs:
- In highway construction on super elevated curves, the rolling shall proceed from_________________?
A. sides towards the centre
B. centre towards the sides
C. lower edge towards the upper edge
D. upper edge towards the lower edge - The terrain may be classified as rolling terrain if the cross slope of land is______________?
A. upto 10%
B. between 10% and 25%
C. between 25% and 60%
D. more than 60% - The sequence of four stages of survey in a highway alignment is______________?
A. reconnaissance, map study, preliminary survey and detailed survey
B. map study, preliminary survey, reconnaissance and detailed survey
C. map study, reconnaissance, preliminary survey and detailed survey
D. preliminary survey, map study, reconnaissance and detailed survey - The ruling design speed on a National Highway in plain terrain as per IRC recommendations is_____________?
A. 60 kmph
B. 80 kmph
C. 100 kmph
D. 120 kmph - Highway facilities are designed for_________________?
A. annual average hourly volume
B. annual average daily traffic
C. thirtieth highest hourly volume
D. peak hourly volume of the year - For highway geometric design purposes the speed used is________________?
A. 15th percentile
B. 50 “”percentile
C. 85th percentile
D. 98 “”percentile - Most suitable material for highway embankments is______________?
A. granular soil
B. organic soil
C. silts
D. clays - Softening point of bitumen to be used for read construction at a place where maximum temperature is 40° C should be______________?
A. less-than 40°C
B. greater than 40°C
C. equal to 40°C
D. none of the above - The maximum limit of water absorption for aggregate suitable for road construction is____________?
A. 0.4 %
B. 0.6%
C. 0.8 %
D. 1.0 % - Which of the following is considered to be the highest quality construction in the group of black top pavements ?
A. mastic asphalt
B. sheet asphalt
C. bituminous carpet
D. bituminous concrete