A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both B. and C.
- Estimating and Costing
- Estimating and Costing
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.