A. indirect manufacturing overhead cost
B. direct manufacturing overhead cost
C. fixed manufacturing overhead cost
D. variable manufacturing overhead cost
Advertisement
Related Mcqs:
- The budgeted variable overhead rate, is multiplied to an actual quantity of allocation base, is to calculate variable manufacturing cost of overheads in ___________?
- A. direct costing method B. indirect costing method C. actual costing method D. normal costing method...
- The standard quantity of input used for achieved output, which is multiplied to standard prices, to calculate variable direct manufacturing cost in __________?
- A. output costing B. standard costing C. achieved costing D. input costing...
- If an actual quantity of cost allocation base is $48000 and budgeted quantity of cost allocation base is $28000, then variable overhead efficiency variance would be __________?
- A. $20,000 B. $76,000 C. $86,000 D. $96,000...
- An actual quantity of cost allocation base is $56000, budgeted quantity of cost allocation base is $17000, then the variable overhead efficiency variance is ___________?
- A. $39,000 B. $49,000 C. $59,000 D. $73,000...
- Of the cost allocation base, the difference between actual and budgeted variable overhead cost multiplied by actual quantity for actual output is classified as ____________?
- A. variable overhead spending variance B. fixed overhead spending variance C. constant spending variance D. potential spending variance...
- In the standard costing, the standard quantity allocation is multiplied to standard overhead rates for allocating __________?
- A. flexible costs B. variable costs C. overhead costs D. fixed costs...
- In normal costing, an actual quantity of cost allocation used base is multiplied to budgeted fixed overhead rates to calculate the ___________?
- A. indirect manufacturing overhead cost B. direct manufacturing overhead cost C. fixed manufacturing overhead cost D. variable manufacturing overhead cost...
- In an actual quantity of cost allocation used, base is multiplied to an actual fixed overhead rates, to calculate ___________?
- A. fixed manufacturing overhead cost B. variable manufacturing overhead cost C. indirect manufacturing overhead cost D. direct manufacturing overhead cost...
- If an actual variable quantity is 50, the actual and budgeted overhead cost of allocation is $7550 and $4500 respectively, then the variable overhead spending variance could be __________?
- A. $182,500 B. $152,500 C. $162,500 D. $172,500...
- If an actual variable quantity is 70, the actual and budgeted overhead cost of allocation is $8650 and $3500 respectively, then the variable overhead spending variance will be __________?
- A. $660,500 B. $560,500 C. $460,500 D. $360,500...