A. $39,000
B. $49,000
C. $59,000
D. $73,000
Advertisement
Related Mcqs:
- If an actual quantity of cost allocation base is $48000 and budgeted quantity of cost allocation base is $28000, then variable overhead efficiency variance would be __________?
- A. $20,000 B. $76,000 C. $86,000 D. $96,000...
- If an actual variable quantity is 50, the actual and budgeted overhead cost of allocation is $7550 and $4500 respectively, then the variable overhead spending variance could be __________?
- A. $182,500 B. $152,500 C. $162,500 D. $172,500...
- If an actual variable quantity is 70, the actual and budgeted overhead cost of allocation is $8650 and $3500 respectively, then the variable overhead spending variance will be __________?
- A. $660,500 B. $560,500 C. $460,500 D. $360,500...
- Of the cost allocation base, the difference between actual and budgeted variable overhead cost multiplied by actual quantity for actual output is classified as ____________?
- A. variable overhead spending variance B. fixed overhead spending variance C. constant spending variance D. potential spending variance...
- The budgeted variable overhead rate, is multiplied to an actual quantity of allocation base, is to calculate variable manufacturing cost of overheads in ___________?
- A. direct costing method B. indirect costing method C. actual costing method D. normal costing method...
- If an actual manufacturing overhead costs is $225000 and actual total quantity of cost allocation base is 2500 labor hours, then the overhead rate will be __________?
- A. $60 B. $90 C. $80 D. $70...
- If an actual manufacturing overhead costs is $485000 and actual total quantity of cost allocation base is 4500 labor hours, then the overhead rate would be _____________?
- A. 109.87 B. $107.78 C. $106.56 D. $104.34...
- If the budgeted annual indirect cost is $60000, budgeted annual quantity of cost allocation base is $3600, then budgeted indirect cost rate will be __________?
- A. 15.67 per piece B. 16.67 per piece C. 14.67 per piece D. 13.67 per piece...
- If the budgeted annual indirect cost is $85000 and budgeted annual quantity of cost allocation base is $7500, then budgeted indirect cost rate would be __________?
- A. 112.34 per piece B. 113.34 per piece C. 111.34 per piece D. 110.34 per piece...
- If the budgeted total cost in fixed overhead is $465200 and the budgeted total quantity is $8750, then budgeted fixed overhead cost per unit will be ____________?
- A. $83.17 B. $73.17 C. $53.17 D. $63.17...