A. for short run
B. for long run
C. for one day
D. for few days
Advertisement
Related Mcqs:
- If the fixed manufacturing cost expenses are under variable costing and are not expensed in absorption costing, it is resulting in _________?
A. production exceeds breakeven sales
B. breakeven sales exceeds production
C. price exceeds cost
D. cost exceeds price - The measuring of capacity in terms of normal capacity utilization is also termed as __________?
A. output demanded
B. input demanded
C. capacity supplied
D. capacity borrowed - The costing system, which is a combination of process costing and job costing system, is classified as __________?
A. weighted costing system
B. average costing system
C. hybrid costing system
D. double costing system - If the total setup cost is $42000 and fixed setup cost is $17000, then the variable fixed cost would be ____________?
A. $59,000
B. $25,000
C. $15,000
D. $39,000 - If the total setup cost is $35000 and fixed setup cost is $19000, then the variable fixed cost would be _____________?
A. $16,000
B. $54,000
C. $64,000
D. $74,000 - If the cost of indirect support labor is $5000, equipment maintenance setup cost is $7000 and machinery leasing cost is $4000 then variable fixed cost will be ___________?
A. $16,000
B. $12,000
C. $18,000
D. $21,000 - If the budgeted fixed cost is $26000, per unit budgeted denominator level is 1300 units, then budgeted fixed cost will be ___________?
A. $50
B. $30
C. $20
D. $40 - If the fixed budgeted manufacturing cost is $35000 and the budgeted production units are 7000, then budgeted fixed manufacturing cost per unit will be ___________?
A. $20
B. $5
C. $10
D. $15 - The product capacity and costing, performance evaluation and regulatory requirements are the purposes of ___________?
A. denominator level choices
B. numerator level choices
C. normal level choices
D. standard level choices - The method of inventory costing, in which all variable and fixed manufacturing cost is considered as inventoriable cost can be termed as __________?
A. absorption costing
B. variable costing
C. fixed costing
D. manufacturing cost
Advertisement