A. denominator level choices
B. numerator level choices
C. normal level choices
D. standard level choices
Advertisement
Related Mcqs:
- If the capacity utilization and its cost are fixed in product costing, the capacity management is ___________?
- A. for short run B. for long run C. for one day D. for few days...
- The costing system, which is a combination of process costing and job costing system, is classified as __________?
- A. weighted costing system B. average costing system C. hybrid costing system D. double costing system...
- The performance is evaluated only on the basis of price variance, if the performance evaluation is __________?
- A. positive B. negative C. zero D. one...
- The normal costing and standard costing methods are used in decisions such as ___________?
- A. investment decisions B. pricing decisions C. product mix decisions D. Both B and C...
- The capacity level of operations which is less than theoretical capacity is considered as ___________?
- A. practical capacity B. theoretical costing C. standard capacity D. actual capacity...
- If the fixed manufacturing cost expenses are under variable costing and are not expensed in absorption costing, it is resulting in _________?
- A. production exceeds breakeven sales B. breakeven sales exceeds production C. price exceeds cost D. cost exceeds price...
- The variance which is included in absorption costing, but not in variable costing is classified as __________?
- A. production volume variance B. cost volume variance C. profit volume variance D. fixed cost variance...
- The costing technique, which classify all the activities in costing hierarchy is classified as ____________?
- A. activity based costing B. non-financial costing C. profit costing D. lump sum costing...
- The measuring of capacity levels, in terms of practical and theoretical capacity is classified as _________?
- A. capacity write down B. capacity write up C. capacity supplied D. capacity borrowed...
- The difference between master budget capacity and practical capacity is considered as ________?
- A. normal used capacity B. unplanned and unused capacity C. planned unused capacity D. unplanned used capacity...