A. $16,000
B. $12,000
C. $18,000
D. $21,000
Advertisement
Related Mcqs:
- An indirect setup labor costs, costs of setup and equipment maintenance and costs of indirect material can be categorized as ______________?
- A. variable batch costs B. fixed batch costs C. variable setup costs D. fixed setup costs...
- If the fixed setup cost is $32000 and the variable setup cost is $12000, then the setup cost will be ___________?
- A. $20,000 B. $34,000 C. $44,000 D. $35,000...
- If the salaries of engineers are $3000, the salaries of supervisors are $4000 and the equipment leasing cost is $3000, then fixed setup costs will be ___________?
- A. $10,000 B. $1,000 C. $7,000 D. $4,000...
- If the fixed setup cost is $21000 and the variable setup cost is $11000, then the setup cost would be _________?
- A. $12,000 B. $15,000 C. $10,000 D. $32,000...
- If the total setup cost is $42000 and fixed setup cost is $17000, then the variable fixed cost would be ____________?
- A. $59,000 B. $25,000 C. $15,000 D. $39,000...
- If the total setup cost is $35000 and fixed setup cost is $19000, then the variable fixed cost would be _____________?
- A. $16,000 B. $54,000 C. $64,000 D. $74,000...
- If the indirect manufacturing labor is $20000, power cost is $5000, maintenance and supplies are of $10000 then the manufacturing budget will be ____________?
- A. $5,000 B. $35,000 C. $15,000 D. $45,000...
- If the budgeted direct labor hours are 4550 and direct labor cost rate is $600 per labor hour then, total direct labor cost would be _____________?
- A. $4,730,000 B. $3,730,000 C. $2,730,000 D. $1,730,000...
- If the budgeted direct labor hours are 3550 and direct labor cost rate is $500 per labor hour, then total direct labor cost would be __________?
- A. $1,775,000 B. $1,675,000 C. $1,875,000 D. $1,975,000...
- If an actual indirect cost incurred is $25000 and the indirect cost allocated is $23000, then the over allocated indirect cost would be ________?
- A. $48,000 B. −$2000 C. $2,000 D. −$48000...