A. manufacturing analysis method
B. price analysis method
C. unit analysis method
D. account analysis method
Related Mcqs:
- To decide whether the cost is variable cost or fixed cost with respect to some specific activity depends upon ___________?
A. units of labor
B. unit of production
C. time horizon
D. units of inventory - The method of estimation of cost function, by making the opinions and analysis about cost and cost drivers is classified as ______?
A. conference method
B. inference method
C. pricing method
D. manufacturing method - If the total setup cost is $35000 and fixed setup cost is $19000, then the variable fixed cost would be _____________?
A. $16,000
B. $54,000
C. $64,000
D. $74,000 - If the total setup cost is $42000 and fixed setup cost is $17000, then the variable fixed cost would be ____________?
A. $59,000
B. $25,000
C. $15,000
D. $39,000 - The method of inventory costing, in which all variable and fixed manufacturing cost is considered as inventoriable cost can be termed as __________?
A. absorption costing
B. variable costing
C. fixed costing
D. manufacturing cost - A cost, consists of some fixed and some variable cost with respect to machine setup hours is termed as _________?
A. setup cost
B. batch cost
C. facility cost
D. lump sum cost - If the budgeted quantity of output unit is 450 and budgeted overhead fixed cost is $250, then budgeted fixed overhead output unit will be __________?
A. $142,500
B. $112,500
C. $122,500
D. $132,500 - The budgeted quantity of output unit is 250 and budgeted overhead fixed cost is $150, then budgeted fixed overhead output unit will be __________?
A. $67,500
B. $57,500
C. $47,500
D. $37,500 - The statistical method used to measure average change in dependent variable, with respect to change of one unit in independent variable is called ___________?
A. times series method
B. time horizon method
C. aggression method
D. regression method - If the cost of indirect support labor is $5000, equipment maintenance setup cost is $7000 and machinery leasing cost is $4000 then variable fixed cost will be ___________?
A. $16,000
B. $12,000
C. $18,000
D. $21,000