A. setup cost
B. batch cost
C. facility cost
D. lump sum cost
Advertisement
Related Mcqs:
- If the fixed setup cost is $21000 and the variable setup cost is $11000, then the setup cost would be _________?
- A. $12,000 B. $15,000 C. $10,000 D. $32,000...
- If the fixed setup cost is $32000 and the variable setup cost is $12000, then the setup cost will be ___________?
- A. $20,000 B. $34,000 C. $44,000 D. $35,000...
- If the total setup cost is $42000 and fixed setup cost is $17000, then the variable fixed cost would be ____________?
- A. $59,000 B. $25,000 C. $15,000 D. $39,000...
- If the total setup cost is $35000 and fixed setup cost is $19000, then the variable fixed cost would be _____________?
- A. $16,000 B. $54,000 C. $64,000 D. $74,000...
- If the cost of indirect support labor is $5000, equipment maintenance setup cost is $7000 and machinery leasing cost is $4000 then variable fixed cost will be ___________?
- A. $16,000 B. $12,000 C. $18,000 D. $21,000...
- To decide whether the cost is variable cost or fixed cost with respect to some specific activity depends upon ___________?
- A. units of labor B. unit of production C. time horizon D. units of inventory...
- An analysis and estimation method of cost, by classifying cost accounts as fixed or variable with respect for specific output level is considered as _____________?
- A. manufacturing analysis method B. price analysis method C. unit analysis method D. account analysis method...
- The method of inventory costing, in which all variable and fixed manufacturing cost is considered as inventoriable cost can be termed as __________?
- A. absorption costing B. variable costing C. fixed costing D. manufacturing cost...
- An indirect setup labor costs, costs of setup and equipment maintenance and costs of indirect material can be categorized as ______________?
- A. variable batch costs B. fixed batch costs C. variable setup costs D. fixed setup costs...
- In the budgeted fixed overhead rate, the number of machine hours are considered as _________?
- A. denominator level B. numerator level C. fixed level D. variable level...
Advertisement