A. Function-related metrics
B. Product-related metrics
C. Size-related metrics
D. None of the mentioned
Explanation: Productivity is expressed in terms of the amount of useful functionality produced in some given time. Function points and object points
are the best-known metrics of this type.
Related Mcqs:
- Which of the following is the reason that software is delivered late ?
A. Changing customer requirements that are not reflected in schedule changes
B. Technical difficulties that could not have been foreseen in advance
C. Human difficulties that could not have been foreseen in advance
D. All of the mentioned - Which risks are associated with the overall size of the software to be built or modified ?
A. Business impact risks
B. Process definition risks
C. Product size risks
D. Development environment risks - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - A _______________ is developed using historical cost information that relates some software metric to the project cost ?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law - What threatens the viability of the software to be built ?
A. Known risks
B. Business risks
C. Project risks
D. Technical risks - Which software project sizing approach develop estimates of the information domain characteristics ?
A. Function point sizing
B. Change sizing
C. Standard component sizing
D. Fuzzy logic sizing - Which of the following is not an approach to software cost estimation ?
A. Empirical
B. Heuristic
C. Analytical
D. Critical - Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned - What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A. Task set
B. Degree of milestone
C. Adaptation criteria
D. All of the mentioned