A. a job
B. an individual employee
C. a particular division in workshop
D. machine
E. overall quality
Related Mcqs:
- Job evaluation is the method-of determining the________________?
A. relative worth of jobs
B. skills required by a worker
C. contribution of a worker
D. contribution of a job
E. effectiveness of various alternatives - Graphical method, simplex method, and transportation method are concerned with__________________?
A. break-even analysis
B. value analysis
C. linear programming
D. queing theory
E. tnaterial handling - The simplex method is the basic method for__________________?
A. value analysis
B. operation research
C. linear programming
D. model analysis
E. none of the above - Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above - Basic motion time study gives times for basic motions in ten thousandths of_______________?
A. second
B. minute
C. hour
D. day
E. none of the above - Work sampling observations are taken on the basis of_______________?
A. detailed calculations
B. convenience
C. table of random numbers
D. past experience
E. fixed percentage of daily production - One time measurement unit (TMU) in method time measurement system equals______________?
A. 0.0001 minute
B. 0.0006 minute
C. 0.006 minute
D. 0.001 minute
E. 0.06 minute - The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store_______________?
A. inflated system
B. primary cost method
C. current value method
D. fixed price method
E. variable price method - TMU in method time measurement stands for__________________?
A. time motion unit
B. time measurement unit
C. time movement unit
D. technique measurement unit
E. time method unit - The first method invented for planning projects was________________?
A. bar chart method
B. milestone chart
C. critical path method (CPM)
D. programme evaluation and review technique (PERT)
E. none of the above