A. flexible costs
B. variable costs
C. overhead costs
D. fixed costs
Related Mcqs:
- In normal costing, an actual quantity of cost allocation used base is multiplied to budgeted fixed overhead rates to calculate the ___________?
A. indirect manufacturing overhead cost
B. direct manufacturing overhead cost
C. fixed manufacturing overhead cost
D. variable manufacturing overhead cost - The standard cost of allocation base, allowed to output achieved, is multiplied to standard variable overhead rate is to calculate __________?
A. indirect manufacturing overhead cost
B. direct manufacturing overhead cost
C. fixed manufacturing overhead cost
D. variable manufacturing overhead cost - If an actual quantity of cost allocation base is $48000 and budgeted quantity of cost allocation base is $28000, then variable overhead efficiency variance would be __________?
A. $20,000
B. $76,000
C. $86,000
D. $96,000 - In an actual quantity of cost allocation used, base is multiplied to an actual fixed overhead rates, to calculate ___________?
A. fixed manufacturing overhead cost
B. variable manufacturing overhead cost
C. indirect manufacturing overhead cost
D. direct manufacturing overhead cost - An actual quantity of cost allocation base is $56000, budgeted quantity of cost allocation base is $17000, then the variable overhead efficiency variance is ___________?
A. $39,000
B. $49,000
C. $59,000
D. $73,000 - If an actual variable quantity is 50, the actual and budgeted overhead cost of allocation is $7550 and $4500 respectively, then the variable overhead spending variance could be __________?
A. $182,500
B. $152,500
C. $162,500
D. $172,500 - If an actual variable quantity is 70, the actual and budgeted overhead cost of allocation is $8650 and $3500 respectively, then the variable overhead spending variance will be __________?
A. $660,500
B. $560,500
C. $460,500
D. $360,500 - If an actual manufacturing overhead costs is $225000 and actual total quantity of cost allocation base is 2500 labor hours, then the overhead rate will be __________?
A. $60
B. $90
C. $80
D. $70 - The costing technique, in which the actual direct rates are multiplied to quantity of direct cost inputs is classified as __________?
A. priced costing
B. actual costing
C. direct costing
D. indirect costing - The budgeted variable overhead rate, is multiplied to an actual quantity of allocation base, is to calculate variable manufacturing cost of overheads in ___________?
A. direct costing method
B. indirect costing method
C. actual costing method
D. normal costing method