A. Performance risk
B. Cost risk
C. Support risk
D. Schedule risk
Related Mcqs:
- Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?
A. Staff turnover
B. Technology change
C. Management change
D. Product competition - Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.” ?
A. Technology change
B. Product competition
C. Requirements change
D. None of the mentioned - Which of the following term is best defined by the statement: “Derive traceability information to maximize information hiding in the design.” ?
A. Underestimated development time
B. Organizational restructuring
C. Requirements changes
D. None of the mentioned - Which of the following term is best defined by the statement “The creation of a new codeline from a version in an existing codeline” ?
A. Branching
B. Merging
C. Codeline
D. Mainline - A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?
A. JAD
B. CLASS
C. FAST
D. None of the mentioned - Which model is used during early stages of the system design after the requirements have been established ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - Which activity sits at the core of software requirements analysis ?
A. Problem decomposition
B. Partitioning
C. Problem elaboration
D. All of the mentioned - What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria - Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned