A. Branching
B. Merging
C. Codeline
D. Mainline
Explanation: The code may then be developed independently.
Related Mcqs:
- Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?
A. Staff turnover
B. Technology change
C. Management change
D. Product competition - Which of the following term is best defined by the statement:”the degree of uncertainty that the product will meet its requirements and be fit for its intended use.”?
A. Performance risk
B. Cost risk
C. Support risk
D. Schedule risk - Which of the following term is best defined by the statement: “The underlying technology on which the system is built is superseded by new technology.” ?
A. Technology change
B. Product competition
C. Requirements change
D. None of the mentioned - Which of the following term is best defined by the statement: “Derive traceability information to maximize information hiding in the design.” ?
A. Underestimated development time
B. Organizational restructuring
C. Requirements changes
D. None of the mentioned - Which of the following is not a Version management feature ?
A. Version and release identification
B. Build script generation
C. Project support
D. Change history recording - Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned - The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
A. Association
B. Decomposition
C. Planning process
D. All of the mentioned - Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
A. FP-Based Estimation
B. Process-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO - Which of the following option is not tracked by configuration management tools ?
A. Tracking of change proposals
B. Storing versions of system components
C. Tracking the releases of system versions to customers
D. None of the mentioned