A. continuous process improvement
B. the need to record information
C. the need to accept quality system
D. none of the mentioned
Explanation: CMM emphasizes the need to record information for later use in the process and for improvement of the process.
Related Mcqs:
- Which of the following is not a maturity level in CMM ?
A. Design
B. Repeatable
C. Managed
D. Optimizing - CO policy in CMM means___________________?
A. The leadership practices in Commitment to Perform
B. The organizational structure (groups) practices in Ability to Perform
C. The policy practices in Commitment to Perform
D. The planning practices in Commitment to Perform - The Capability Maturity Model (CMM) is a continuous model ?
A. True
B. False - CMM stands for_____________________?
A. Capability Management Module
B. Conservative Maturity Model
C. Capability Maturity Module
D. Capability Maturity Model - In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management - Program modularization and Source code translation are the activities of ____________________?
A. Forward engineering
B. Reverse Engineering
C. Reengineering
D. Reverse Engineering and Reengineering - There are _______________ overlapping stages in the lifetime of large and complex sociotechnical systems?
A. two
B. three
C. four
D. five - Which of the following is a software process certification ?
A. JAVA Certified
B. IBM Certified
C. ISO-9000
D. Microsoft Certified - In which stage of process improvement bottlenecks and weaknesses are identified ?
A. Process measurement
B. Process analysis
C. Process change
D. None of the mentioned - Which of the following is not included in failure costs ?
A. rework
B. repair
C. failure mode analysis
D. none of the mentioned