A. True
B. False
Explanation: The CMM is discrete rather than continuous.
Related Mcqs:
- Which of the following is not a maturity level in CMM ?
A. Design
B. Repeatable
C. Managed
D. Optimizing - CO policy in CMM means___________________?
A. The leadership practices in Commitment to Perform
B. The organizational structure (groups) practices in Ability to Perform
C. The policy practices in Commitment to Perform
D. The planning practices in Commitment to Perform - CMM stands for_____________________?
A. Capability Management Module
B. Conservative Maturity Model
C. Capability Maturity Module
D. Capability Maturity Model - The CMM emphasizes____________________?
A. continuous process improvement
B. the need to record information
C. the need to accept quality system
D. none of the mentioned - In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management - ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned - The Incremental Model is combination of elements of_____________________?
A. Build & FIX Model & Waterfall Model
B. Linear Model & RAD Model
C. Linear Model & Prototyping Model
D. Waterfall Model & RAD Model - Spiral model was developed by ___________________?
A. Victor Bisili
B. Berry Boehm
C. Bev Littlewood
D. Roger Pressman - What does ACT stands for in In Boehm model for software maintenance ?
A. Actual change track
B. Annual change track
C. Annual change traffic
D. Actual change traffic - How many stages are there in Iterative-enhancement model used during software maintenance ?
A. two
B. three
C. four
D. five