A. process layout
B. product layout
C. fixed position layout
D. plant layout
E. functional layout
Related Mcqs:
- Which of the following layouts is suited for mass production_________________?
A. process layout
B. product layout
C. fixed position layout
D. plant layout
E. functional layout - In which of the following layouts, the lines need to the balanced_______________?
A. process layout
B. product layout
C. fixed position layout
D. plant layout
E. functional layout - Which of the following organisations is best suited for steel plants__________________?
A. functional organisation
B. line organisation
C. staff organisation
D. line, staff and functional organisations
E. scalar organisation - The process layout is best suited where______________?
A. specialisation exists
B. machines are arranged according to sequence of operation
C. few number of non-standardised units are to be produced
D. mass production is envisaged
E. bought out items are more - The difference between the time available to do the job and the time required to do the job, is known as_________________?
A. event
B. float
C. duration
D. constraint
E. none of the above - Job evaluation is the method-of determining the________________?
A. relative worth of jobs
B. skills required by a worker
C. contribution of a worker
D. contribution of a job
E. effectiveness of various alternatives - The objective of time study is to determine the time required to complete a job by_______________?
A. fast worker
B. average worker
C. slow worker
D. new entrant
E. any one of the above - The standard time for a job is_________________?
A. total work content
B. base time + relaxation time
C. total work content + basic time
D. total work content + delay contingency allowance
E. total work content + relaxation time - The allowed time for a job equals standard time plus___________________?
A. policy allowance
B. interference allowance
C. process allowance
D. learning allowance
E. unforeseen allowance - The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as_________________?
A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Bedaux Plan
E. Rowan Plan