A. 1.5
B. 2.0
C. 2.5
D. 3.0
Advertisement
Related Mcqs:
- For trunk sewers more than 1.25 m in diameter, the ratio of the maximum daily sewage flow to the average daily sewage flow is assumed________________?
- A. 1.5 B. 2.0 C. 2.5 D. 3.0...
- The ratio of maximum sewage flow to average sewage flow for mains up to 1 m in diameter, is___________________?
- A. 1.5 B. 2.0 C. 3.0 D. 4.0...
- The ratio of maximum sewage flow to average sewage flow for trunk mains having diameters more than 1.25 m, is____________________?
- A. 1.5 B. 2.0 C. 3.0 D. 4.0...
- You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at___________________?
- A. Full depth B. Half full C. Two third full D. Three fourth full...
- Rate of flow of sewage is generally assumed__________________?
- A. More than the rate of water supply B. Equal to the rate of water supply C. Less than the rate of water supply D. At 150 litres per capita...
- If q is the average sewage flow from a city of population P, the maximum sewage flow______________?
- A. Q = [(4 + )/(18 + )] q B. Q = [(18 + P)/(4 + )] q C. Q = [(18 + )/(4 + )] q D. Q = [(5 + )/((15 + )] q...
- The ratio of minimum hourly flow to the average flow of sewage is_________________?
- A. 1/4 B. 1/3 C. 1/2 D. 3/4...
- If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is__________________?
- A. 1.39 m B. 1.49 m C. 1.59 m D. 1.69 m...
- The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be__________________?
- A. 0.9 cm B. 1.2 m C. 1.5 m D. > 1.5 m...
- The angle subtended by the surface of sewer water with partial flow, at sewer centre is 120°, the depth of sewerage is________________________?
- A. 20 cm B. 25 cm C. 40 cm D. 50 cm...
Advertisement