A. (Q/P) e-(Q/R)S/(TdS + 1)
B. (Q/R) e-TdS/(Q/P) (S + 1)
C. (Q/P) e-TdS/(Q/R) (S + 1)
D. (Q/R) e-(P/Q)S/(TdS + 1)