A. Ordinary annuity
B. Perpetuity
C. Annuity due
D. Deferred annuity
Civil Engineering Mcqs
Civil Engineering Mcqs for Preparation of Job Test and interview, freshers, Students, competitive exams etc. Multiple choice questions here are on topics such as Building Construction, Materials for Construction, Basic Surveying, Highway Engineering, Dams, Airport Engineering, Structural Analysis etc.
A. T-bills
B. Securities
C. Bond
D. Bank notes
A. Ordinary annuity
B. Perpetuity
C. Annuity due
D. Deferred annuity
A. The amounts of all payments are equal.
B. The payments are made at equal interval of time.
C. The first payment is made at the beginning of the first period.
D. Compound interest is paid on all amounts in the annuity.
A. Bond
B. T-bills
C. Stock
D. Promissory note
A. Identification
B. Recognition of objects
C. Judging the significance of objects
D. All of these
A. Electric waves
B. Sound waves
C. Electromagnetic waves
D. Wind waves
A. 26,000 km
B. 30,000 km
C. 36,000 km
D. 44,000 km
A. The off-nadir resolution is degraded
B. The ground distance swept by the senor, IFOV is proportional to sec2 of scan measured from the nadir
C. The details towards the edge of the scan get compressed
D. All of these
A. Positional accuracies ~ 1 – 2 m if rover is less than 1-2 km from the reference station
B. Positional accuracies ~ 2 – 5m if rover is less than 2-5 fm from the reference station
C. Positional accuracies ~ 5 – 10 m if rover is less than 5-10 km from reference station
D. Positional accuracies ~ 5 – 10 m if rover is less than 25 km
