A. intrados
B. rise
C. spandril
D. extrados
Civil Engineering Mcqs
Civil Engineering Mcqs for Preparation of Job Test and interview, freshers, Students, competitive exams etc. Multiple choice questions here are on topics such as Building Construction, Materials for Construction, Basic Surveying, Highway Engineering, Dams, Airport Engineering, Structural Analysis etc.
A. 0.5 m
B. 0.7 m
C. 0.9 m
D. 1.2 m
A. compacting the soil
B. draining the soil
C. increasing the depth of foundation
D. grouting
A. friction pile
B. sheet pile
C. batter pile
D. anchor pile
A. perpendicular distance between intra-dos and extrados
B. vertical distance between springing line and intrados
C. perpendicular distance between springing line and extrados
D. none of the above
A. cork flooring
B. glass flooring
C. wooden flooring
D. linoleum flooring
A. 25 mm
B. 25 to 40 mm
C. 40 to 65 mm
D. 65 to 100 mm
A. 25 mm
B. 40 mm
C. 65 mm
D. 100 mm
A. increase the depth of foundation
B. drain the soil
C. compact the soil
D. replace the poor soil
A. double flemish bond facing and Eng-lish bond backing in each course
B. English bond facing and double flemish bond backing in each course
C. stretcher bond facing and double flemish bond backing in each course
D. double flemish bond facing and header bond backing in each course
