A. is maximum at neutral axis
B. decreases below the neutral axis and increases above the neutral axis
C. increases below the neutral axis and decreases above the neutral axis
D. remains same
Civil Engineering Mcqs
Civil Engineering Mcqs for Preparation of Job Test and interview, freshers, Students, competitive exams etc. Multiple choice questions here are on topics such as Building Construction, Materials for Construction, Basic Surveying, Highway Engineering, Dams, Airport Engineering, Structural Analysis etc.
A. 3.5 m
B. 4 m
C. 4.5 m
D. 5 m
A. 50 mm
B. 75 mm
C. 100 mm
D. 120 mm
A. effective span of T-beam
B. distance between points of zero moments in the beam
C. distance between points of maximum moments in the beam
D. clear span of the T-beam
A. 24 to 48 hours
B. 3 days
C. 7 days
D. 14 days
A. 24 to 48 hours
B. 3 days
C. 7 days
D. 14 days
A. ±5% of average
B. ± 10% of average
C. ± 15% of average
D. ±20% of average
A. 5%
B. 10%
C. 15%
D. 20%
A. 0.75-0.80
B. 0.80-0.85
C. 0.85 – 0.92
D. above 0.92
A. 28 liters
B. 30 liters
C. 32 liters
D. 34 liters
