A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %
Estimating and Costing
Estimating and Costing
A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja
A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
A. Master trap
B. Intercepting trap
C. Interception manhole
D. All the above
A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both B. and C.
A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm
A. 1.5 m 3
B. 2.5 m3
C. 3.5 m3
D. 5.0 m3
A. 1.80 litres for 5 to 10 users
B. 1.20 litres for 15 users
C. 1.35 for 20 users
D. All the above
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation