A. variable overhead cost
B. fixed overhead cost
C. fixed batch cost
D. variable batch cost
Related Mcqs:
- An indirect setup labor costs, costs of setup and equipment maintenance and costs of indirect material can be categorized as ______________?
A. variable batch costs
B. fixed batch costs
C. variable setup costs
D. fixed setup costs - If an actual indirect cost incurred is $25000 and the indirect cost allocated is $23000, then the over allocated indirect cost would be ________?
A. $48,000
B. −$2000
C. $2,000
D. −$48000 - If an actual indirect cost incur is $35000 and the indirect cost allocated is $43000, then the under allocated indirect cost will be __________?
A. $78,000
B. −$78000
C. −$8000
D. $8,000 - If the cost of indirect support labor is $5000, equipment maintenance setup cost is $7000 and machinery leasing cost is $4000 then variable fixed cost will be ___________?
A. $16,000
B. $12,000
C. $18,000
D. $21,000 - If the indirect manufacturing labor is $20000, power cost is $5000, maintenance and supplies are of $10000 then the manufacturing budget will be ____________?
A. $5,000
B. $35,000
C. $15,000
D. $45,000 - If an allocated indirect cost is $1500 and the actual incurred indirect cost is $1200, then this is classified as __________?
A. applied indirect cost
B. applied direct cost
C. incurred indirect cost
D. over allocated indirect cost - If the budgeted annual indirect cost is $85000 and budgeted annual quantity of cost allocation base is $7500, then budgeted indirect cost rate would be __________?
A. 112.34 per piece
B. 113.34 per piece
C. 111.34 per piece
D. 110.34 per piece - If the budgeted cost in indirect cost pool is $144500 and total quantity of cost allocation base is $165500, then the budgeted indirect cost rate will be __________?
A. 67.30%
B. 87.31%
C. 55.50%
D. 45.50% - If the budgeted indirect cost is $225 and the budgeted cost allocation base is $750 per hour, then the annual indirect cost (budgeted) would be __________?
A. $168,750
B. $148,570
C. $186,750
D. $125,680 - If the budgeted cost in indirect cost pool is $139600 and total quantity of cost allocation base is $155600, then the budgeted indirect cost rate would be __________?
A. 69.72%
B. 79.72%
C. 99.75%
D. 89.72%