A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Related Mcqs:
- The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these - The area of the cross-section of a road fully in banking shown in the given figure, is________________?
A. [sb² + r² (2bd + sd)²]/(r² – s²)
B. [sb² + r² (2bd + sd)²]/(r² – s5)
C. [sb² + r² (2bd + sd)²]/(r – s)
D. None of these - The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
A. b – rd)²/(r – s)
B. b – rd)²/(r + s)
C. ½ × (b + rd)²/(r – s)
D. b – rd)²/(s – r) - The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is____________________?
A. 3250 m3
B. 3225 m3
C. 3275 m3
D. 3300 m3 - Pick up the excavation where measurements are made in square metres for payment ?
A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both B. and C. - If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
A. Mid-section formula
B. Trapezoidal formula
C. Prismoidal formula
D. All the above - The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?
A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum - The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation - The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d) - The trap which is provided to disconnect the house drain from the street sewer is called_________________?
A. Master trap
B. Intercepting trap
C. Interception manhole
D. All the above