A. $16,000
B. $54,000
C. $64,000
D. $74,000
Related Mcqs:
- If the fixed setup cost is $21000 and the variable setup cost is $11000, then the setup cost would be _________?
A. $12,000
B. $15,000
C. $10,000
D. $32,000 - If the fixed setup cost is $32000 and the variable setup cost is $12000, then the setup cost will be ___________?
A. $20,000
B. $34,000
C. $44,000
D. $35,000 - If the total setup cost is $42000 and fixed setup cost is $17000, then the variable fixed cost would be ____________?
A. $59,000
B. $25,000
C. $15,000
D. $39,000 - If the cost of indirect support labor is $5000, equipment maintenance setup cost is $7000 and machinery leasing cost is $4000 then variable fixed cost will be ___________?
A. $16,000
B. $12,000
C. $18,000
D. $21,000 - A cost, consists of some fixed and some variable cost with respect to machine setup hours is termed as _________?
A. setup cost
B. batch cost
C. facility cost
D. lump sum cost - If the fixed budgeted manufacturing cost is $35000 and the budgeted production units are 7000, then budgeted fixed manufacturing cost per unit will be ___________?
A. $20
B. $5
C. $10
D. $15 - If the budgeted total cost in fixed overhead is $465200 and the budgeted total quantity is $8750, then budgeted fixed overhead cost per unit will be ____________?
A. $83.17
B. $73.17
C. $53.17
D. $63.17 - If the budgeted total cost in fixed overhead is $385000 and the budgeted total quantity is $6730, then budgeted fixed overhead cost per unit will be __________?
A. $57.21 per unit
B. $67.21 per unit
C. $77.21 per unit
D. $87.21 per unit - An indirect setup labor costs, costs of setup and equipment maintenance and costs of indirect material can be categorized as ______________?
A. variable batch costs
B. fixed batch costs
C. variable setup costs
D. fixed setup costs - If an actual indirect cost incur is $35000 and the indirect cost allocated is $43000, then the under allocated indirect cost will be __________?
A. $78,000
B. −$78000
C. −$8000
D. $8,000