A. Software Configuration Item
B. Baseline
C. Configuration
D. Configuration Control Board
Explanation: Configuration Control Board (CCB. is the group with the responsibility for reviewing and approving changes to baselines
Related Mcqs:
- How are baselines verified ?
A. By reviews
B. By inspections
C. By testing of code
D. All of the mentioned - According to ISO 9001, inspection and testing comes under which management responsibility ?
A. Process control
B. Document control
C. Control of nonconforming products
D. Servicing - The testing in which code is checked___________________?
A. Black box testing
B. White box testing
C. Red box testing
D. Green box testing - Testing done without planning and Documentation is called_________________?
A. Unit testing
B. Regression testing
C. Adhoc testing
D. None of the mentioned - Which of the following is not used in measuring the size of the software_____________________?
A. KLOC
B. Function Points
C. Size of module
D. None of the mentioned - The construction of object-oriented software begins with the creation of__________________?
A. design model
B. analysis model
C. code levels
D. both design and analysis model - Which of the following is not a part of Execution Flow during debugging ?
A. Step Over
B. Step Into
C. Step Up
D. Step Out - Software Testing with real data in real environment is known as_____________________?
A. alpha testing
B. beta testing
C. regression testing
D. none of the mentioned - Which of the following is not a typical environment in communication facilitation ?
A. Multiple teams
B. Multiple user groups
C. Multiple fests
D. Multiple locations - The degree to which the design specifications are followed during manufacturing is known as________________?
A. Quality of design
B. Quality of conformance
C. Quality of testing
D. None of the mentioned