A. Change Control Board
B. Change Control Baseline
C. Cumulative Changes in Baseline
D. None of the mentioned
Related Mcqs:
- SPICE stands for __________________?
A. Software Process Improvement and Compatibility Determination
B. Software Process Improvement and Control Determination
C. Software Process Improvement and Capability Determination
D. None of the mentioned - ITG stands for___________________?
A. instantaneous test group
B. integration testing group
C. individual testing group
D. independent test group - Many applications using static analysis find 0.1-0.2% NCSS. NCSS stands for______________________?
A. Non-Code Source Statement
B. Non Comment Source Sentence
C. Non-Comment Source Statement
D. All of the mentioned - SCM stands for_________________?
A. Software Control Management
B. Software Configuration Management
C. Software Concept Management
D. None of the mentioned - The testing in which code is checked___________________?
A. Black box testing
B. White box testing
C. Red box testing
D. Green box testing - Which of the following is not used in measuring the size of the software_____________________?
A. KLOC
B. Function Points
C. Size of module
D. None of the mentioned - Which of the following is a part of testing OO code ?
A. Validation tests
B. Integration tests
C. Class tests
D. System tests - Software Testing with real data in real environment is known as_____________________?
A. alpha testing
B. beta testing
C. regression testing
D. none of the mentioned - What is one or more software configuration items that have been formally reviewed and agreed upon and serve as a basis for further development ?
A. Configuration
B. Baseline
C. Software
D. All of the mentioned - How are baselines verified ?
A. By reviews
B. By inspections
C. By testing of code
D. All of the mentioned