A. three
B. four
C. five
D. six
Explanation: The five levels are: initial, repeatable, defined, managed, optimizing
Related Mcqs:
- The CMM model is a technique to____________________?
A. automatically maintain the software reliability
B. improve the software process
C. test the software
D. all of the mentioned - Which level of CMM is for process management ?
A. Initial
B. Repeatable
C. Defined
D. Optimizing - How is software reliability defined ?
A. time
B. efficiency
C. quality
D. speed - Which of the following is not a phase of “bathtub curve” of hardware reliability ?
A. Useful Life
B. Burn-in
C. Wear-out
D. Time - How many product quality factors are proposed in McCall quality model ?
A. 2
B. 3
C. 11
D. 8 - A system maintaining its integrity while accepting a temporary halt in its operation is said to be in a state of___________________?
A. Full Fault Tolerance
B. Graceful Degradation
C. Fail Soft
D. Fail Safe - Which of the following approaches are used to achieve reliable systems?
A. Fault prevention
B. Fault removal
C. Fault tolerance
D. All of the mentioned - Which of the following Error Detection checks is not a part of Application detection ?
A. Hardware checks
B. Timing checks
C. Reversal checks
D. Coding checks - IMC Networks is a leading __________________ certified manufacturer of optical networking and LAN/WAN connectivity solutions for enterprise, telecommunications and service provider applications ?
A. Telco Systems
B. D-Link
C. Arista Networks
D. ISO 9001 - Which of the following is not a Probabilistic Model ?
A. Error seeding
B. NHPP
C. Input domain
D. Halstead’s software metric