A. Early design estimation model
B. Application Composition estimation model
C. Comprehensive cost estimation model
D. Post architecture estimation model
Explanation: It was a part of COCOMO
Related Mcqs:
- COCOMO-II was developed at _____________________?
A. University of Texas
B. University of Southern California
C. MIT
D. IIT-Kanpur - COCOMO was developed initially by _____________________ ?
A. B.Beizer
B. Rajiv Gupta
C. B.W.Bohem
D. Gregg Rothermal - Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - COCOMO stands for____________________?
A. Constructive cost model
B. Comprehensive cost model
C. Constructive cost estimation model
D. Complete cost estimation model - How many forms exists of Barry Boehm’s COCOMO Model ?
A. Two
B. Three
C. Four
D. No form exists - v Programming language experience is a part of which factor of COCOMO cost drivers ?
A. Personnel Factor
B. Product Factor
C. Platform Factor
D. Project Factor - Quality planning is the process of developing a quality plan for__________________?
A. team
B. project
C. customers
D. project manager - Which technique is applicable when other projects in the same analogy application domain have been completed ?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law - The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?
A. EV = (Sopt + 4Sm + Spess)/4
B. EV = (Sopt + 4Sm + Spess)/6
C. EV = (Sopt + 2Sm + Spess)/6
D. EV = (Sopt + 2Sm + Spess)/4 - Which activity sits at the core of software requirements analysis ?
A. Problem decomposition
B. Partitioning
C. Problem elaboration
D. All of the mentioned