A. LOC
B. Halstead’s program length
C. Function Count
D. Cyclomatic Complexity
Explanation: It is the part of white box testing.
Related Mcqs:
- Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - A _______________ is developed using historical cost information that relates some software metric to the project cost ?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law - Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - Which risks are associated with the overall size of the software to be built or modified ?
A. Business impact risks
B. Process definition risks
C. Product size risks
D. Development environment risks - If a Direct approach to software project sizing is taken, size can be measured in__________________?
A. LOC
B. FP
C. LOC and FP
D. None of the mentioned - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - What combines procedures and tools to manage different versions of configuration objects that are created during the software process ?
A. Change control
B. Version control
C. SCIs
D. None of the mentioned - Which of the following is not an adaptation criteria for software projects ?
A. Size of the project
B. Customers Complaints
C. Project staff
D. Mission criticality - What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria