A. 40-20-40
B. 50-20-30
C. 30-40-30
D. 50-30-20
Explanation: A recommended distribution of effort across the software process is 40% (analysis and design), 20% (coding), and 40% (testing).
Related Mcqs:
- Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - What is used to determine the recommended degree of rigor with which the software process should be applied on a project ?
A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria - Which of the following is not an option to achieve reliable cost and effort estimate ?
A. Base estimates on similar projects that have already been completed
B. Use one or more empirical models for software cost and effort estimation
C. Use relatively simple decomposition techniques to generate project cost and effort estimates
D. The ability to translate the size estimate into human effort, calendar time, and dollars - Which of the following costs is not part of the total effort cost ?
A. Costs of networking and communications
B. Costs of providing heating and lighting office space
C. Costs of lunch time food
D. Costs of support staff - Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
A. FP-Based Estimation
B. Process-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO - Which of the following is not project management goal ?
A. Keeping overall costs within budget
B. Delivering the software to the customer at the agreed time
C. Maintaining a happy and well-functioning development team
D. Avoiding customer complaints - Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
A. travel and training costs
B. hardware and software costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned - Which of the following is not an effective software project management focus ?
A. people
B. product
C. popularity
D. process - Who defines the business issues that often have significant influence on the project ?
A. Practitioners
B. Project managers
C. Senior managers
D. None of the mentioned