A. Personnel Factor
B. Product Factor
C. Platform Factor
D. Project Factor
Related Mcqs:
- Which one is not a stage of COCOMO-II ?
A. Early design estimation model
B. Application Composition estimation model
C. Comprehensive cost estimation model
D. Post architecture estimation model - COCOMO-II was developed at _____________________?
A. University of Texas
B. University of Southern California
C. MIT
D. IIT-Kanpur - COCOMO was developed initially by _____________________ ?
A. B.Beizer
B. Rajiv Gupta
C. B.W.Bohem
D. Gregg Rothermal - Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - COCOMO stands for____________________?
A. Constructive cost model
B. Comprehensive cost model
C. Constructive cost estimation model
D. Complete cost estimation model - How many forms exists of Barry Boehm’s COCOMO Model ?
A. Two
B. Three
C. Four
D. No form exists - Which model assumes that systems are created from reusable components, scripting or database programming ?
A. An application-composition model
B. A post-architecture model
C. A reuse model
D. An early design model - A _______________ is developed using historical cost information that relates some software metric to the project cost ?
A. Algorithmic cost modelling
B. Expert judgement
C. Estimation by analogy
D. Parkinson’s Law - Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?
A. Project size
B. Planning process
C. Project complexity
D. Degree of structural uncertainty - Which of the following is not a project factor that should be considered when planning the structure of software engineering teams ?
A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date