A. CMM
B. ISO 9001
C. ISO 9000-3
D. None of the mentioned
Explanation: ISO 9000-3 states that the supplier should carry out reviews to ensure the requirements are met and design methods are correctly carried out.
Advertisement
Related Mcqs:
- The primary objective of formal technical reviews is to find _________________ during the process so that they do not become defects after release of the software?
- A. errors B. equivalent faults C. failure cause D. none of the mentioned...
- _______________ measures the ability of a regression test selection technique to handle realistic applications ?
- A. Efficiency B. Precision C. Generality D. Inclusiveness...
- The process of generating analysis and design documents is known as ___________________?
- A. Software engineering B. Software re-engineering C. Reverse engineering D. Re-engineering...
- Degree to which design specifications are followed in manufacturing the product is called_________________?
- A. Quality Control B. Quality of conformance C. Quality Assurance D. None of the mentioned...
- In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
- A. Software Product Engineering B. Software Quality Assurance C. Software Subcontract Management D. Software Quality Management...
- Which of the following manuals is a user documentation ?
- A. SRS -Software Requirement Specification B. SDD -Software Design Document C. System Overview D. None of the mentioned...
- Which of the following manuals is not a user documentation ?
- A. Beginner’s Guide B. Installation guide C. Reference Guide D. SRS...
- Which of the following is not a SQA plan for a project ?
- A. evaluations to be performed B. amount of technical work C. audits and reviews to be performed D. documents to be produced by the SQA group...
- Which of the following is not included in failure costs ?
- A. rework B. repair C. failure mode analysis D. none of the mentioned...
- Which of the following is not an appraisal cost in SQA ?
- A. inter-process inspection B. maintenance C. quality planning D. testing...