A. True
B. False
Explanation: It is always best to start process analysis with an existing model. People then may extend and change this.
Related Mcqs:
- The Capability Maturity Model (CMM) is a continuous model ?
A. True
B. False - In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
A. Software Product Engineering
B. Software Quality Assurance
C. Software Subcontract Management
D. Software Quality Management - The process of transforming a model into source code is known as___________________?
A. Forward engineering
B. Reverse engineering
C. Re-engineering
D. Reconstructing - The process of generating analysis and design documents is known as ___________________?
A. Software engineering
B. Software re-engineering
C. Reverse engineering
D. Re-engineering - The two dimensions of spiral model are ______________________?
A. diagonal, angular
B. radial, perpendicular
C. radial, angular
D. diagonal, perpendicular - Spiral model was developed by ___________________?
A. Victor Bisili
B. Berry Boehm
C. Bev Littlewood
D. Roger Pressman - Model preferred to create client/server applications is _______________________?
A. WINWIN Spiral Model
B. Spiral Model
C. Concurrent Model
D. Incremental Model - How many phases are there in Taute Maintenance Model ?
A. six
B. seven
C. eight
D. nine - Which one of the following is not a maintenance model ?
A. Waterfall model
B. Reuse-oriented model
C. Iterative enhancement model
D. Quick fix model - How many stages are there in Iterative-enhancement model used during software maintenance ?
A. two
B. three
C. four
D. five