A. three
B. four
C. five
D. six
Explanation: Process measurement, analysis and change are the three stages.
Related Mcqs:
- In which stage of process improvement bottlenecks and weaknesses are identified ?
A. Process measurement
B. Process analysis
C. Process change
D. None of the mentioned - Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ?
A. True
B. False - There are _______________ overlapping stages in the lifetime of large and complex sociotechnical systems?
A. two
B. three
C. four
D. five - How many stages are there in Iterative-enhancement model used during software maintenance ?
A. two
B. three
C. four
D. five - The process of generating analysis and design documents is known as ___________________?
A. Software engineering
B. Software re-engineering
C. Reverse engineering
D. Re-engineering - Which of the following is a software process certification ?
A. JAVA Certified
B. IBM Certified
C. ISO-9000
D. Microsoft Certified - The process of transforming a model into source code is known as___________________?
A. Forward engineering
B. Reverse engineering
C. Re-engineering
D. Reconstructing - Prototypes and 4GL business systems are categorized under which process ?
A. Informal
B. Managed
C. Methodical
D. Supported - Which of the following is not a part of process change ?
A. Introducing new practices, methods or processes
B. Introducing new team members to existing project
C. Introducing or removing deliverable
D. Introducing new roles or responsibilities - ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned