A. deleted
B. eliminated
C. identified
D. eliminated and identified
Explanation: ISO 9001 requires that the causes of nonconforming product to be identified. Potential causes of nonconforming product are eliminated.
Related Mcqs:
- ISO 9001 is not concerned with _______________ of quality records?
A. collection
B. maintenance
C. verification
D. dis-positioning - The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?
A. True
B. False - Which selective retest technique selects every test case that causes a modified program to produce a different output than its original version?
A. Coverage
B. Minimization
C. Safe
D. Maximization - Processes for evolving a software product depend on __________________?
A. Type of software to be maintained
B. Development processes used
C. Skills and experience of the people involved
D. All of the mentioned - ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?
A. ISO 9001
B. ISO 9000-4
C. CMM
D. All of the mentioned - Degree to which design specifications are followed in manufacturing the product is called_________________?
A. Quality Control
B. Quality of conformance
C. Quality Assurance
D. None of the mentioned - Identify the correct statement with respect to Evolutionary development ?
A. Evolutionary development usually has two flavors; exploratory development, and throw-away prototyping
B. Very large projects are usually done using evolutionary development based approach
C. It facilitates easy project management, through the high volume of documentation it generates
D. Sometimes the construction of a throw-away prototype is not followed by a re- implementation of the software system using a more structured approach - Software Maintenance includes ?
A. Error corrections
B. Enhancements of capabilities
C. Deletion of obsolete capabilities
D. All of the mentioned - Third Party Certification for software standards is based on ___________________?
A. Ul 1998, Second Edition
B. UT 1998, Second Edition
C. Ul 1992, Second Edition
D. Ul 1996, Second Edition - What is a tangible output of an activity that is predicted in a project plan ?
A. Deliverable
B. Activity
C. Condition
D. Process