A. System Analyst
B. Scribe
C. Facilitator
D. Manager
Explanation: A Facilitator (a customer/developer/an outsider) controls the FAST meeting.His role is to ensure that the meeting is productive.
- Requirement Engineering
- Requirement Engineering
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.