A. C – Customer
B. A – Actor
C. T – Transformation
D. E – ER Model
Explanation: ‘E’ in CATWOE stands for Environmental constraints.
Related Mcqs:
- Choose the disadvantage of using SSM as an elicitation technique ?
A. It incorporates human element into design
B. SSM is in its infant stage
C. SSM is suitable for new systems
D. Standard methodologies like Role Exploration, Issue Resolution and Reorganization support SSM
Read More Details about this Mcq - Consider the following Statement: “The output of a program shall be given within 10 secs of event X 10% of the time.”What characteristic of SRS is being depicted here ?
A. Consistent
B. Verifiable
C. Non-verifiable
D. Correct
Read More Details about this Mcq - Arrange the given sequence to form a SRS Prototype outline as per IEEE SRS Standard?
i. General description
ii. Introduction
iii. Index
iv. Appendices
v. Specific Requirements
A. iii, i, ii,v, iv
B. iii, ii, i, v, iv
C. ii, i, v, iv, iii
D. iii, i, ii
Read More Details about this Mcq - Which two requirements are given priority during Requirement Management of a product ?
A. User and Developer
B. Functional and Non-functional
C. Enduring and Volatile
D. All of the mentioned
Read More Details about this Mcq - Which is one of the most important stakeholder from the following ?
A. Entry level personnel
B. Middle level stakeholder
C. Managers
D. Users of the software
Read More Details about this Mcq - Which of the following Requirement Elicitation Techniques is applicable to messy, changing and ill-defined problem situations ?
A. Quality Function Deployment (QFD)
B. Prototyping
C. Soft Systems Methodology (SSM)
D. Controlled Requirements Expression (CORE)
Read More Details about this Mcq - Which one of the following is a requirement that fits in a developer’s module ?
A. Availability
B. Testability
C. Usability
D. Flexibility
Read More Details about this Mcq - Which of the following property does not correspond to a good Software Requirements Specification (SRS) ?
A. Verifiable
B. Ambiguous
C. Complete
D. Traceable
Read More Details about this Mcq - Which of the following is included in SRS ?
A. Cost
B. Design Constraints
C. Staffing
D. Delivery Schedule
Read More Details about this Mcq - Which of the following is a requirement management activity ?
A. Investigation
B. Design
C. Construction and Test
D. All of the mentioned
Read More Details about this Mcq
Mcq Added by: admin