A. True
B. False
Explanation: This situation is seen in every field of work as each professional has his/her way of looking onto things & would argue to get his/her point approved.
Related Mcqs:
- Requirements traceability is one of the most important part requirement management. It may also be referred to as the heart of requirement management?
A. True
B. False - The requirements that result from requirements analysis are typically expressed from one of three perspectives or views.WhaT is that perspective or view ?
A. Developer
B. User
C. Non-Functional
D. Physical - Keeping the requirements of QFD in mind which of the following is not an example of an Expected Requirement ?
A. Ease of software installation
B. Overall operational correctness and reliability
C. Specific system functions
D. Quality graphical display - Which two requirements are given priority during Requirement Management of a product ?
A. User and Developer
B. Functional and Non-functional
C. Enduring and Volatile
D. All of the mentioned - What requirement gathering method developed at IBM in 1970s is used for managing requirement elicitation ?
A. JAD
B. Traceability
C. FAST
D. Both JAD and Traceability - Which one of the following is not a step of requirement engineering ?
A. elicitation
B. design
C. analysis
D. documentation - Which of the following Requirement Elicitation Techniques removes the poor understanding of application domain and lack of common terminology between the users and the analysts ?
A. FODA
B. CORE
C. IBIS
D. Prototyping - Requirements Analysis is an Iterative Process ?
A. True
B. False - Which of the following statements explains portability in non-functional requirements ?
A. It is a degree to which software running on one platform can easily be converted to run on another platform
B. It cannot be enhanced by using languages, OS’ and tools that are universally available and standardized
C. The ability of the system to behave consistently in a user-acceptable manner when operating within the environment for which the system was intended
D. None of the mentioned - Requirements elicitation is a cyclic process_________________?
A. True
B. False