A. systems designer
B. project manager
C. systems owner
D. external system user
Advertisement
Related Mcqs:
- Project Management ensures that______________?
- A. project’s risk is assessed B. project’s feasibility is assessed C. system is developed at minimum cost D. both A and B...
- _____________ type of testing ensures the system is free of errors and is ready to be placed into operation?
- A. Audit B. General C. Technical D. Data...
- _________ systems are interactive information systems that assist a decision maker in approaching ill-structured problems by offering analytical models and access to database ?
- A. Decision making B. Systematic C. Cognitive D. Decision support systems...
- What should not be part of an acceptable use policy ?
- A. Allowable use of systems B. Legal obligations C. Encryption policies D. User responsibilities...
- Michael hammer defines re-engineer as ___________ and radical redesign of business process to achieve the performance such as cost, quality, service and speed?
- A. Business process B. The fundamental rethinking C. Organization restructuring D. None of the above...
- The first CMM level at which measurable goals for quality and productivity are established is______________?
- A. Level 1 B. Level 2 C. Level 3 D. Level 4...
- A property or quality the system must have is called a_______________?
- A. scope B. functional requirement C. preliminary requirement D. nonfunctional requirement...
- The most important attribute of information quality that a manager requires is ?
- A. relevance B. media C. presentation D. timeliness...
- An ongoing activity of systems support is________________?
- A. assisting users B. adapting the system to new requirements C. recovering the system D. all of the above...
- The task of identifying and expressing system requirements is performed in which phase of systems analysis ?
- A. problem analysis phase B. logical design phase C. scope definition phase D. requirements analysis phase...
Advertisement