A. Preliminary risk analysis
B. Life-cycle risk analysis
C. Operational risk analysis
D. All of the mentioned
Explanation: This risk assessment takes place during the system development life cycle after design choices have been made..
Related Mcqs:
- How many stages are there in Risk-driven requirements specification ?
A. three
B. four
C. five
D. six - To specify security requirements, one should identify the risks that are to be dealt with ?
A. True
B. False - Static analysis is now routinely used in the development of many safety and security critical systems?
A. True
B. False - Which reliability requirements are concerned with maintaining copies of the system ?
A. Checking requirements
B. Recovery requirements
C. Redundancy requirements
D. Ambiguous requirements - What is Life cycle risk assessment ?
A. Risk assessment before the system has been deployed
B. Risk assessment while the system is being developed
C. All of the mentioned
D. None of the mentioned - A chemical plant system may detect excessive pressure and open a relief valve to reduce these pressures before an explosion occurs. What kind of dependability and security issue the example states ?
A. Hazard avoidance
B. Damage limitation
C. Hazard detection
D. Hazard detection and removal - What are security controls ?
A. Controls that are intended to ensure that attacks are unsuccessful
B. Controls that are intended to detect and repel attacks
C. Controls that are intended to support recovery from problems
D. All of the mentioned - Security engineering is only concerned with maintenance of systems such that they can resist malicious attacks ?
A. True
B. False - An impersonation of an authorised user is an example of a security threat ?
A. True
B. False - The records of each patient that is receiving or has received treatment resembles which security concept ?
A. Asset
B. Threat
C. Vulnerability
D. Control